PROJECTS · 2020

New non-combustible material yard at the Yamaha motorcycle parts plant

Service
Construction
Location
Thang Long Industrial Park, Hanoi
Area
1200 m²
Year
2020
Handover
Đã hoàn thành

The challenge

Located inside the Yamaha motorcycle parts plant at Thang Long Industrial Park, Hanoi. Plant management needed to expand the campus with a new staging yard for materials feeding the plant's production line, sited right beside the production hall.

Hasacon's solution

After consultations, Hasacon proposed a 1,200 m² steel-frame warehouse as a staging area for non-combustible solid materials. Terrain surveys began in late 2019, with methodical proposals for each work item: site study, architectural design, infrastructure, structural engineering and M&E systems.

Delivered result

Delivered exactly to the approved plan and schedule; the plant kept operating throughout construction; the campus landscape was untouched; quality and safety assured before and after handover.

Process

  1. Receive & survey
  2. Draft the preliminary plan
  3. Architectural, infrastructure and technical design
  4. Approve the execution plan
  5. Execute construction
  6. Inspect and accept the project
  7. Hand over & maintain